The short answer
What to know first.
A gorilla proposal survives contact with reality when eight lines are ticked in order. One: the brief, complete in one pass, with dates, passport-accurate ages, honest fitness and who holds client funds. Two: the sector, fixed by live permit availability rather than preference. Three: the permits, held under the authority's terms with full payment where UWA requires it. Four: the lodge lock-in, drawn only from the fixed sector's gate and confirmed alongside the permits. Five: passport names, reconciled character by character against every document. Six: the funds path, agreed against the authority's deadlines rather than the invoice cycle. Seven: the documents pack, white-labelled to the advisor's brand, with dietary, medical and emergency data collected once and cleanly. Eight: the under-15 Plan B, designed with a named adult wherever the party includes younger travellers. Each line protects the next, and a file that skips one usually meets it again at a trailhead.
At a glance
The planning brief.
The order matters
Brief, sector, permits, lodge lock-in, passport names, funds, documents, Plan B: each step protects the next.
The two locks
Permits lock the date; the lodge locks the gate. Neither is real until confirmed, and neither should be promised before it is.
The money path
Who holds client funds and when the authority must be paid are agreed at design, because permit deadlines are not negotiable.
Sail provides
The checklist as a working document, plus the confirmations that let the advisor tick each line with evidence.
01
Lines one and two: brief, then sector
The complete first brief is the file's foundation: travellers and ages as passports read, date windows with honest flexibility, fitness as it actually is, taste in a sentence, and the commercial layer of who holds funds and how paper should be branded. Sent whole, it lets the NETT design land in one pass.
The sector then comes from availability, not aspiration. Live inventory for the party's size on the possible dates names the gates that can host the journey, and the proposal is built on one of those, because a proposal built on a sold-out gate is fiction with good typography.
02
Lines three and four: the two locks
Permits lock the date. They are secured under the authority's terms, with UWA's full-payment date-lock executed on time and the receipt held on the file. Until this line is ticked, every other line is provisional, and the proposal should say so honestly rather than imply certainty it does not yet have.
The lodge locks the gate. It is drawn from the fixed sector's own shortlist and confirmed alongside the permits, never before them, so the famous-address-wrong-gate failure cannot occur. Together the two locks turn a proposal into an operable file; separately each is only half a promise.

03
Lines five and six: names and money
Passport names are reconciled character by character across permits, tickets and documents, because the permit is issued against the passport and checked against it at briefing. A renamed, transposed or maiden-name mismatch is minutes to fix at confirm and a crisis at the trailhead.
The funds path is agreed against the authority's calendar: where the permit deadline lands before the advisor's usual client-payment rhythm, the file says so at design and the collection is scheduled to reality. Money conversations age badly; this one is had once, early, in writing.
04
Lines seven and eight: paper and Plan B
The documents pack goes out under the advisor's brand, complete: itinerary, vouchers, kit guidance for the season, and the data collected once at confirm, dietary, medical, insurance and the emergency contact who answers. White-label means the client experiences their advisor's file, operated invisibly from Entebbe.
The final line is the under-15 Plan B wherever the party includes younger travellers: the designed morning, the named adult, the current activity minimums confirmed with the authority. Ticked last, it is the line that protects the family's whole trek day, and it is the one most templates forget.
Questions travellers ask
Useful answers, before you decide.
Can Sail supply this checklist as a working document?
Yes: it exists as a file-ready template that partner advisors can keep, with each line tied to the confirmation Sail returns as evidence. The article is the public version; the working copy arrives with the first NETT design.
Which checklist line is most often skipped?
Passport-name reconciliation, because it feels clerical. It is also the line whose failure is hardest to fix late, since permits are issued against the document. Sail checks it at confirm regardless.
Does the checklist change for Rwanda files?
The order holds; line two becomes the park rather than a sector, and line three follows RDB's current terms. Names, funds, documents and the Plan B are identical disciplines in both systems.

